Virtual factory visit
A filmed walk through the Thailand plant: element conversion, semi-automated rolling, vacuum integrity testing and packing.
100%
Vacuum integrity testing2.5M+ EA/yr
Residential production capacitySemi-automated rolling
Semi-automated rolling lines build every element to a controlled, repeatable spec.
Quality control
Every element is vacuum integrity tested, with 5% of each batch wet tested for rejection and flow.
Controlled environment
Rolling areas are kept under particulate control, designed to limit contamination.
Discuss your manufacturing requirements
Share your element specifications, volumes and OEM requirements.
